OPERATION INSTRUCTION :- CHECK IF THE SCREW CAP (1) IS FIRMLY CLOSED. FILL THE HIGH PRESSURE SPRAYER AS FSR AS THE 2 LITRE LINE AND CLOSE THE SCREW CAP (QUANTITY OF LIQUID NO MORE THAN 1 LITRE OTHERWISE THE SPRAYER DEVELOPS INSUFFICIENT PRESSURE). PUMP (2) UNTIL RESISTANCE IS FELT(APPROXIMATELY 30 STROKES). SPRAYING BY PRESSING LEVER(3). ENGAGE TRIGGER LOCK FOR CONTINUES SPRAYING(4).
Reviews
There are no reviews yet.